• 112-2_1

    112-2_1

  • 124-1_1

    124-1_1

  • 132-1_1

    132-1_1

  • 135-1_1

    135-1_1

  • 156-4_1

    156-4_1

  • 169-1_1

    169-1_1

  • allenmore-entry-thumb

    allenmore-entry-thumb

  • 203-1_1

    203-1_1

Allenmore Hospital Front Entry

Tacoma, Washington

Description

New Front entry way with canopy, demolition, earthwork, paving, electrical, mechanical and plumbing, and new finishes. The project is one continuous phase consisting of:

  • Demolition – Existing Boiler Plant building, underground utility tunnel, covered walkway and canopies, and sidewalks and parking lots with associated landscape plantings and utilities.
  • New Construction New Entry vestibule curtainwall, with structural steel canopy, and associated sitework, paving and landscaping. Large import of soil to infill depression where the existing boiler plant currently is located
  • Remodel existing front entry and lobby area with new finishes and electrical work

Quick Facts

  • 43,000 SF
  • Tenant improvements
  • Occupied facility
  • Owner: MultiCare