Energy Efficiency Project

Bremerton, WA

Description

The Energy Efficiency project was a $25M design-build upgrade to Navy facilities, providing structural upgrades to an existing warehouse structure, demolition of existing buildings, and various energy improvements at Naval Base Kitsap. The Absher team provided architectural design, engineering, and construction services for upgrades to twelve (12) separate buildings, three of which are listed on the National Historic Registry. All buildings were within the Controlled Industrial Area of the Base. Eight buildings received seismic upgrades, and four buildings were demolished.

Quick Facts

  • $25,144,435
  • Project encompassed 1,232,477 SF
  • Design-build
  • Naval Base Kitsap