• STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

  • STEM School

    STEM School

STEM School

Redmond, WA

Description

The project is a phased, 63,000 SF school project that was constructed utilizing modular construction. The school is located on a wooded, 21-acre site, of which 7.5 acres were developed to accommodate the school construction, parking, bus loop and storm system facilities.

Quick Facts

  • $24,080,000
  • 63,000 SF
  • New 675-student school on a wooded, 21-acre site.
  • Owner: Lake Washington School District
  • Architect: Integrus Architects